...
首页> 外文期刊>Hydro review >Deploying an Ice Boom at Jenpeg Generating Station
【24h】

Deploying an Ice Boom at Jenpeg Generating Station

机译:在Jenpeg发电站部署冰架

获取原文
获取原文并翻译 | 示例
           

摘要

During the winter months, production of frazil ice upstream of Jenpeg Generating Station in northern Manitoba has been known to cause operational problems, including the blockage of powerhouse intakes. To solve this problem, owner Manitoba Hydro deployed a new ice boom, replacing a previously existing ice boom that was first installed in 1988. The new ice boom is designed to form and retain an ice cover upstream of Jenpeg Generating Station in order to minimize the amount of frazil ice buildup at the intakes.
机译:在冬季,众所周知,马尼托巴省北部Jenpeg发电站上游的巴西冰生产会引起运行问题,包括动力源进水口阻塞。为了解决这个问题,业主曼尼托巴水电公司部署了一个新的冰杆,以取代先前在1988年首次安装的现有冰杆。新的冰杆旨在在Jenpeg发电站的上游形成并保留冰盖,以最大程度地减少冰盖。进水口处结冰的数量。

著录项

  • 来源
    《Hydro review》 |2014年第6期|102104|共2页
  • 作者单位

    Geniglace Inc. Razek Abdelnour, Ing.;

    Sediment and ice studies, water resources engineering, Manitoba Hydro;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号