首页> 外文期刊>Hydro review >Spillway Rehabilitation at Dells Hydro: Keys to Economical, Fast-Track Completion
【24h】

Spillway Rehabilitation at Dells Hydro: Keys to Economical, Fast-Track Completion

机译:戴尔水电公司溢洪道修复:经济,快速完成的关键

获取原文
获取原文并翻译 | 示例
           

摘要

In replacing the deteriorated spillway deck and hoists at its 8.4-MW Dells hydro facility, Xcel Energy faced numerous constraints related to time, economics, and river flows. Thanks to comprehensive project planning and innovative techniques for demolition and construction, the utility was able to complete the project within budget and well ahead of schedule.
机译:Xcel Energy在更换其8.4兆瓦Dells水力发电站中恶化的溢洪道甲板和葫芦时,Xcel Energy面临着与时间,经济和河流流量有关的诸多限制。由于全面的项目计划和创新的拆除与施工技术,该公用事业公司能够在预算范围内并提前完成项目。