首页> 外文期刊>IEEE Power & Energy Magazine >No Light in August: Power System Restoration Following the 2003 North American Blackout
【24h】

No Light in August: Power System Restoration Following the 2003 North American Blackout

机译:八月不露面:2003年北美停电后电力系统恢复

获取原文
获取原文并翻译 | 示例
           

摘要

On 14 August 2003, three 345-kV transmission circuits in northeastern Ohio contacted overgrown trees during a 40-min time span, starting a chain of events that culminated in the collapse of the electrical grid across the eastern Great Lakes region, the northeastern United States, and parts of eastern Canada. In the aftermath of the disturbance, large portions of the Eastern Interconnection were blacked out, and several electrical islands were present. System operators faced a formidable task: to reassemble the grid and restore power to tens of millions of customers. The challenges that had to be overcome varied significantly from one state or province to another. New York, New England, Ontario, Michigan, and Ohio each had unique problems that operators had to address.
机译:2003年8月14日,俄亥俄州东北部的三个345 kV输电线路在40分钟的时间内接触了茂密的树木,引发了一系列事件,最终导致美国东北大湖区的电网崩溃。 ,以及加拿大东部的部分地区。发生干扰后,东部互连网的大部分地区都被遮蔽,并出现了几个电气岛。系统运营商面临着一项艰巨的任务:重新组装电网并为数千万客户恢复供电。从一个州或省到另一个州,必须克服的挑战差别很大。纽约,新英格兰,安大略,密歇根州和俄亥俄州都有运营商必须解决的独特问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号