...
首页> 外文期刊>Innovative Infrastructure Solutions >Attempt to compare risk analysis methods in a highway viaduct project of the penetrating Ghazaouet in Algeria
【24h】

Attempt to compare risk analysis methods in a highway viaduct project of the penetrating Ghazaouet in Algeria

机译:试图在阿尔及利亚的穿透Ghazaouet的高速公路高度高速公路项目中比较风险分析方法

获取原文
获取原文并翻译 | 示例
           

摘要

Risk management is a major concern for construction companies in Algeria. Indeed, these companies often face risks that may disrupt a smooth-running construction project. In addition, the latent effects of these risks can jeopardize the durability of the structure as well as the safety and comfort of users. The work presented here consists in considering the most appropriate risk analysis methods employed in project risk management. The main purpose is therefore to design and create a comparison matrix according to predefined criteria and weights in order to compare the different methods and classify them. To do so, it was decided to carry out a confrontation of methods like the preliminary risk analysis, bow tie, failure modes, effects and criticality analysis, and systems malfunction analysis methodology (MADS) (Methodologie d'Analyse de Dysfonctionnement des Systemes) and method organised systematic analysis of risk (MOSAR), in the case of the project involving the construction of a highway viaduct in the Algerian environment. At the end of this article, an attempt is made to demonstrate which of the risk analysis methods is best suited for this type of project.
机译:风险管理是阿尔及利亚建筑公司的主要关注点。实际上,这些公司往往面临可能破坏流畅的建筑项目的风险。此外,这些风险的潜在效果可以危及结构的耐用性以及用户的安全性和舒适性。在此提出的工作包括考虑项目风险管理中最合适的风险分析方法。因此,主要目的是根据预定义的标准和权重设计和创建比较矩阵,以便比较不同的方法并对它们进行分类。为此,决定对初步风险分析,船首绑定,失效模式,效果和关键性分析以及系统故障分析方法(MAD)进行对抗,以及系统故障分析方法有组织的风险系统分析(摩托车),在项目的情况下涉及在阿尔及利亚环境中建造公路高架桥的情况。在本文结束时,尝试展示哪种风险分析方法最适合这种类型的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号