首页> 外文期刊>Intelligent automation and soft computing >Rail Mounted Gantry Crane Scheduling In Rail-Truck Transshipment Terminal
【24h】

Rail Mounted Gantry Crane Scheduling In Rail-Truck Transshipment Terminal

机译:铁路卡车转运站中的轨道式龙门起重机调度

获取原文
获取原文并翻译 | 示例
           

摘要

Rail mounted gantry crane (RMGC) scheduling is vital to handling efficiency in rail-truck transshipment terminals. In this paper, we propose an optimization model for RMGC scheduling problem based on a dual cycle mode. A genetic algorithm is designed to obtain the optimization handling sequence. Computational experiments on a specific rail-truck transshipment terminal show that the proposed method is effective to solve RMGC scheduling problems in rail-truck transshipment terminals.
机译:铁路龙门起重机(RMGC)的调度对于提高铁路卡车转运码头的效率至关重要。在本文中,我们提出了基于双循环模式的RMGC调度问题的优化模型。设计遗传算法以获得优化处理序列。在特定的铁路转运码头上进行的计算实验表明,该方法对于解决铁路转运码头的RMGC调度问题是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号