首页> 外文期刊>Computational intelligence and neuroscience >Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode
【24h】

Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

机译:基于混合处理模式的铁路集装箱码头轨道式龙门起重机调度优化

获取原文
获取原文并翻译 | 示例
           

摘要

Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC.
机译:轨道式龙门起重机(RMGC)调度对于减少装卸操作的跨度和提高集装箱装卸效率非常重要。在本文中,我们提出了一种RMGC调度优化模型,其目的是确定优化处理顺序,以最大程度地减少处理任务中的RMGC空闲负载时间。提出了蚁群优化算法以获得近似最优解。进行了特定铁路集装箱码头的计算实验,以说明所提出的模型和求解算法。结果表明,该方法可有效减少RMGC的空载时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号