...
首页> 外文期刊>The international journal on hydropower & dams >Contract awarded to equip the 1 GW Pakal Dul project in India
【24h】

Contract awarded to equip the 1 GW Pakal Dul project in India

机译:授予印度1 GW Pakal Dul项目装备的合同

获取原文
获取原文并翻译 | 示例
           

摘要

Voith Hydro has been awarded a contract by Chenab Valley Power Projects (CVPP) for the supply of the electro-mechanical equipment for the 1000 MW Pakal Dul hydroelectric project in India's northern state of Jammu and Kashmir. Under the contract, which was signed this January but announced on 14 March, the engineering group will supply four 250 MW Francis turbines and generators, together with auxiliary equipment, for the project, which is being built on the river Marusadar, the main tributary of the Chenab river, in Kishtwar district.
机译:福伊特水电已获得Chenab Valley Power Projects(CVPP)的合同,为印度北部查Jam和克什米尔邦的1000 MW Pakal Dul水电项目提供机电设备。根据今年1月签署但于3月14日宣布的合同,工程组将为该项目提供4台250 MW的弗朗西斯水轮机和发电机以及辅助设备,该项目将在马鲁萨达尔河(Marusadar的主要支流)上建造。基什瓦尔区的Chenab河。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号