...
首页> 外文期刊>The international journal on hydropower & dams >New substation helps Indonesia leverage its geothermal potentia
【24h】

New substation helps Indonesia leverage its geothermal potentia

机译:新的变电站帮助印度尼西亚利用其地热潜力

获取原文
获取原文并翻译 | 示例
           

摘要

ABB has supplied a prefabricated substation to harness geothermal power on the island of Sumatra, Indonesia. The project has connected a new geothermal powerplant near Rantau Dedap, located in a volcanic complex in a remote highland part of south Sumatra, far from the island's main transmission system. The 220 MW plant will help provide carbon-free electricity for almost 500 000 homes. Working closely with PT Rekayasa Industri, an Indonesian EPC company and its customer, PT Supreme Energy, ABB engineered, manufactured, supplied, installed and commissioned a prefabricated gas-insulated substation (GIS), which was delivered fully assembled and tested.
机译:ABB已提供了一个预制变电站,以利用印度尼西亚苏门答腊岛上的地热能。该项目已经连接了位于Rantau Dedap附近的一座新的地热发电厂,该发电厂位于苏门答腊南部偏远高地的一个火山综合体中,远离该岛的主要输电系统。 220兆瓦的发电厂将帮助为近50万个家庭提供无碳电力。 ABB与印尼EPC公司PT Rekayasa Industri及其客户PT Supreme Energy紧密合作,设计,制造,供应,安装并调试了预制的气体绝缘变电站(GIS),该项目已完全组装并经过测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号