...
首页> 外文期刊>The international journal on hydropower & dams >EDF inaugurates new unit at La Coche pumped-storage plant
【24h】

EDF inaugurates new unit at La Coche pumped-storage plant

机译:EDF在La Coche泵送储存厂揭开新单位

获取原文
获取原文并翻译 | 示例
           

摘要

Electricite de France (EDF) inaugurated on 14 October the expanded La Coche pumped-storage plant in the Isere Valley, Savoie, in the French Alps. The new 240 MW surface powerplant at the existing 320 MW La Coche pumped-storage plant was inaugurated by Jean-Bernard Levy, EDF Group's Chairman and Chief Executive, in the presence of members of local government and representatives of the local and re-gional authorities. The new station, which cost € 150 million, and is equipped with France's most powerful Pelton turbine supplied by Andritz Hydro, was designed to increase availability of the existing plant by 30 per cent to 90 per cent, by improving maintenance and operation, increasing peak power production by 20 per cent and increasing pure power production by 100 GWh/year as well as increasing the facility's provision of ancillary services.
机译:Carticity De France(EDF)于10月14日开创了Isere Valley,Savoie,在法国阿尔卑斯山的扩展La Coche泵送储存厂。在现有的320 MW La Coche泵送储存厂的新款240 MW表面供电人员由Jean-Bernard Levy,EDF集团的主席和行政长官在地方政府成员和当地和重新纳米当局的代表面前开展了。该车站,售价1.5亿欧元,并配备法国最强大的佩尔顿涡轮机由Andritz Hydro提供,旨在通过提高维护和运营,增加峰值的现有工厂的可用性为30%至90%电力产量增加了20%,并增加了100 GWH /年的纯电力产量,以及增加设施的辅助服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号