首页> 外文期刊>The international journal on hydropower & dams >Study for a low head energy site at Sawer dam, Canada
【24h】

Study for a low head energy site at Sawer dam, Canada

机译:加拿大锯坝低头能源现场的研究

获取原文
获取原文并翻译 | 示例
           

摘要

The Bawitik Power Corporation sought to develop a generating station at Sawer Creek dam on the Otonabee river near the town of Lakefield, in Ontario, Canada. With 3.2 m of head, the developers concluded that the challenge would be economic rather than technical, and a phased development process was used that optimizes both. The technical solution was developed using a set based design approach, and extensive turbine market soundings. This was coordinated with an early contractor involvement approach allowing the design and construction methods to be optimized, along with costs that are not driven by the design choices.
机译:Bawitik Power Corporation寻求在加拿大安大略省的湖菲尔德镇附近的Otonabee河上的Sawer Creek大坝开发了一站。凭借3.2米的头部,开发人员得出结论,挑战将是经济而非技术,并且使用分阶段的开发过程,以优化两者。技术解决方案是使用基于集合的设计方法和广泛的涡轮机市场探测开发的。这与早期承包商参与方法协调,允许优化设计和施工方法,以及设计选择不驱动的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号