...
首页> 外文期刊>The international journal on hydropower & dams >Unit 5 to be upgraded at Inga Ⅱ, DRC…
【24h】

Unit 5 to be upgraded at Inga Ⅱ, DRC…

机译:单元5要在IngaⅡ,DRC升级......

获取原文
获取原文并翻译 | 示例
           

摘要

Ivanhoe Mines Energy DRC has signed an MoU with the Democratic Republic of Congo's state power company Societe Nationale d'Electricite (SNEL) to upgrade unit 5 at the 1424 MW Inga Ⅱ hydropower facility on the Congo river. The project will be implemented as a public-private partnership. An estimated 162 MW of capacity is expected to be available after upgrading the unit, which will supply the Kamoa-Kakula Copper Mine, ranked as the world's fourth-largest copper deposit. Initial copper production at the site is scheduled to start this July. Surplus power from the upgraded unit will be delivered to the grid to increase access to electricity for the citizens of the DRC.
机译:Ivanhoe Mines Energy DRC签署了刚果民主共和国刚果国家电力公司Societe Nationale D'Bellicity(Snel)的谅解备忘录,以在刚果河上的1424兆瓦IngaⅡ水电站升级单位5。 该项目将实施为公私伙伴关系。 估计的162兆瓦的容量将在升级单位后提供,该装置将提供Kamoa-Kakula铜矿,排名为世界上最大的铜矿矿床。 本网站的初始铜生产计划于7月开始。 升级单位的剩余电力将交付给电网,以增加对DRC市民的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号