Commissioning of the Ruo Ndiza IPP scheme in Malawi leads to a local grid upgrade

机译:Malawi的Ruo Ndiza IPP计划的调试导致当地网格升级

获取原文
获取原文并翻译 | 示例
           

摘要

The 8 MW Ruo Ndiza run-of-river project in Malawi, completed at the end of 2019, was fully commissioned in 2020, despite some technical challenges with the weak local grid, and has been matching expectations of estimated generation within its first full year of operation. The run-of-river project utilises flow from the Ruo and Ndiza rivers to drive turbines in a single powerhouse and deliver power to ESCOM, the Malawian utility, through a shared interconnector. The project was developed in two phases, with the contract for the full water-to-wire package being awarded to Gilkes in mid-2018, for the installation of three horizontal Pelton turbines.
机译:8 MW Ruo Ndiza在马拉维的河流项目于2019年底完成,在2020年完全委托,尽管本地网格疲软了一些技术挑战,并在首次全年内达到了预期的估计发电 操作。 河流循环项目利用Ruo和Ndiza河流的流量通过共享互联器来驱动单个功率房中的涡轮机,并通过共享互联器向ESCOM提供电源。 该项目是两阶段开发的,为2018年中期授予吉尔克斯的全水送水包合同,用于安装三个水平佩尔顿涡轮机。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号