...
首页> 外文期刊>The international journal on hydropower & dams >RusHydro and CTG plan JV to complete and operate Nizhne-Bureyskaya
【24h】

RusHydro and CTG plan JV to complete and operate Nizhne-Bureyskaya

机译:RusHydro和CTG计划合资完成和运营Nizhne-Bureyskaya

获取原文
获取原文并翻译 | 示例
           

摘要

RusHydro, Russia's state-controlled hydropower producer, announced on 8 May the signing of a cooperation agreement with China Three Gorges Corporation (CTG) with a view to establishing a joint venture to finalize construction and operate the 320 MW Nizhne-Bureyskaya storage hydro plant on the river Bureya, a tributary of the river Amur, in the Far East of Russia. The agreement is the latest in a series signed by the Russian and Chinese companies since 2013 regarding joint development and operation of storage facilities on the tributaries of the Amur to generate power for the two neighbours, but also to reduce the risk of further major floods in the Far East of Russia and in northeastern China.
机译:俄罗斯国有水电生产商RusHydro于5月8日宣布与中国三峡公司(CTG)签署合作协议,以期建立合资企业,最终确定并运营320兆瓦的Nizhne-Bureyskaya蓄水电站。俄罗斯远东地区的阿穆尔河支流布列亚河。该协议是俄罗斯和中国公司自2013年以来签署的一系列最新协议,该协议涉及联合开发和运营阿穆尔河支流上的储存设施,以为两个邻国发电,同时也减少了进一步发生洪灾的风险。俄罗斯远东地区和中国东北地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号