...
首页> 外文期刊>The international journal on hydropower & dams >Consultant sought for Salto Grande environmental studies
【24h】

Consultant sought for Salto Grande environmental studies

机译:顾问寻求萨尔托格兰德环境研究

获取原文
获取原文并翻译 | 示例
           

摘要

The Inter-American Development Bank invited expressions of interest in December from consultants for a contract to modernize the environmental management of the 1890 MW Salto Grande hydroelectric complex on the Uruguay river, between Concordia in Argentina and Salto in Uruguay. Expressions of interest were due by 24 January. The contract, to be financed by the IDB through a loan awarded to the Comision Tecnica Mixta Salto Grande, requires identification of areas where environmental management can be updated, taking into account new and available technologies and practices in the field; and the development of an environmental management plan for the medium and long term of the complex, comprising existing information and existing environmental studies. The medium- and long-term investment plan will incorporate recommendations from studies, and should aim to ensure the extended life of the complex for the next 30 years.
机译:美洲开发银行在12月邀请顾问表达意向,签署一项合同,以使阿根廷康科迪亚和乌拉圭之间的乌拉圭河上1890兆瓦萨尔托格兰德水电站的环境管理现代化。感兴趣的截止日期是1月24日。该合同将由美洲开发银行通过授予Comision Tecnica Mixta Salto Grande的贷款提供资金,要求确定可更新环境管理的领域,同时要考虑到该领域的新技术和实践;以及为该建筑群的中长期制定一项环境管理计划,其中包括现有信息和现有环境研究。中长期投资计划将纳入研究建议,并旨在确保该综合体在未来30年内具有更长的使用寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号