首页> 外文期刊>The international journal on hydropower & dams >Pre-feasibility study shows promising results for Monont'sa
【24h】

Pre-feasibility study shows promising results for Monont'sa

机译:预可行性研究显示Monont'sa的前景可观

获取原文
获取原文并翻译 | 示例
           

摘要

A pre-feasibility study to investigate the feasibility of the Monont'sa pumped-storage plant in Lesotho has concluded that the scheme will provide significant power to South Africa's rapidly developing neighbour, when required to do so, according to consultant Gibb, a member of the Joint Venture commissioned by the Lesotho Electricity Company (LEC). Gibb worked in the JV with EDF (France), URS (UK), and local consultants Knight Piesold and Royal Haskoning DHV, to produce the report, together with GWC, a consulting engineering company in Lesotho. The study took 12 months. The 1200 MW pumped-storage project, if implemented, will meet medium- and long-term energy requirements of the region. Since South Africa has suffered power shortages, and has been rationing the power it supplies to Lesotho, the country has been seeking ways to generate its own energy through hydro generation.
机译:据莱索托的Monont's抽水蓄能厂的可行性研究进行的前可预见性研究得出的结论是,根据要求,该计划将为南非快速发展的邻国提供强大的动力。莱索托电力公司(LEC)委托的合资企业。 Gibb与法国EDF,URS(英国)以及当地顾问Knight Piesold和Royal Haskoning DHV一起在合资企业中工作,并与莱索托的咨询工程公司GWC一起制作了该报告。该研究耗时12个月。如果实施了1200兆瓦的抽水蓄能项目,它将满足该地区的中长期能源需求。由于南非遭受电力短缺,并一直在分配给莱索托的电力供应,该国一直在寻找通过水力发电产生自己的能源的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号