首页> 外文期刊>International Journal on Hydropower & Dams >Corrosion monitoring of post-tensioned strands at the Piedra del Aguila spillway
【24h】

Corrosion monitoring of post-tensioned strands at the Piedra del Aguila spillway

机译:Piedra del Aguila溢洪道后张应力股的腐蚀监测

获取原文
获取原文并翻译 | 示例
           

摘要

The Piedra del Aguila project in Argentina is a concrete gravity dam constructed in the 1980s, on the Limay river. The dam includes a spillway channel controlled by four gates. The spillway structure includes several post-tensioned systems installed in the concrete piers. These systems do not meet the cable protection standards of modern methods, which provide two barriers against corrosion and can be monitored. In 2004, several leaks were detected that could have reached the steel tendons. Because of this, an innovative programme was developed to ascertain the integrity and remaining life of the steel strands. This paper presents a summary of the activities performed and the instrumentation installed at Piedra del Aguila to assist with the long-term monitoring of the dam.
机译:阿根廷的Piedra del Aguila项目是1980年代在利马伊河上建造的混凝土重力坝。大坝包括一个由四个闸门控制的溢洪道。溢洪道结构包括安装在混凝土墩中的多个后张紧系统。这些系统不符合现代方法的电缆保护标准,该标准提供了两个防腐蚀屏障并且可以对其进行监控。在2004年,发现了一些可能已经到达钢腱的泄漏。因此,开发了一个创新程序来确定钢绞线的完整性和剩余寿命。本文总结了在Piedra del Aguila进行的活动和安装的仪器,以协助对大坝进行长期监控。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2014年第6期|64-70|共7页
  • 作者单位

    National Atomic Energy Commission, Corrosion Department Av. Gral. Paz 1499, (1650) San Martin, Argentina;

    CONICET and Universidad Nacional de San Martin, Argentina ,CONICET (National Council of Scientific and Technological Research) Av. Rivadavia 1917 (1033), Buenos Aires, Argentina;

    Hidroelectrica Piedra del Aguila S.A., Auscultation and Maintenance Division, Piedra del Aguila (8315), Argentina;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号