...
【24h】

Sao Simao to be refurbished

机译:圣思茅要翻新

获取原文
获取原文并翻译 | 示例
           

摘要

Brazil's Companhia Energetica de Minas Gerais (Cemig) has awarded a contract worth more than €60 million to a consortium led by Alstom for the refurbishment of the 1710 MW Sao Simao hydro plant. Sao Simao, on the Paranaiba river between the States of Goias and Minas Gerais in southern Brazil, is Cemig's largest hydropower plant. Its six turbine-generating units began operating in 1978.
机译:巴西的Companhia Energetica de Minas Gerais(Cemig)已与阿尔斯通(Alstom)牵头的财团签署了一份价值超过6000万欧元的合同,以翻新1710兆瓦的圣思茅水电站。巴西南部戈亚斯州和米纳斯吉拉斯州之间的巴拉那巴河上的圣西芒是塞米格最大的水力发电厂。它的六个涡轮发电机组于1978年开始运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号