...
首页> 外文期刊>International Journal on Hydropower & Dams >Power Machines continues to supply units for Zhigulevskaya rehabilitation
【24h】

Power Machines continues to supply units for Zhigulevskaya rehabilitation

机译:Power Machines继续为Zhigulevskaya修复项目提供设备

获取原文
获取原文并翻译 | 示例
           

摘要

RusHydro, Russia's State wholesale hydropower producer, has signed an annex to an existing contract with Power Machines, the country's leading power engineering company, for the supply of five more 129 MW generating units for the 2320 MW Zhigulevskaya hydro plant on the Volga river. RusHydro announced on 14 January that Power Machines is to supply and supervise installation and startup of new turbines for units 7,8, 16, 18 and 20, as well as equipment to replace some of the major components of the units' existing generators. The equipment is to be delivered and commissioned by the end of 2016.
机译:俄罗斯国家批发水电生产商RusHydro与该国领先的电力工程公司Power Machines签署了一份现有合同的附件,该合同将为伏尔加河上的2320 MW Zhigulevskaya水电厂再提供5台129 MW发电机组。 RusHydro在1月14日宣布,动力机器公司将为7、8、16、18和20号机组提供新的涡轮机,并监督其安装和启动,以及更换该机组现有发电机某些主要组件的设备。该设备将于2016年底交付并调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号