The construction of Vietnam's Son La RCC dam

机译:越南Son La RCC大坝的建设

获取原文
获取原文并翻译 | 示例
           

摘要

The RCC dam for the Son La hydro project requires slightly more than 3 × 10~6 m~3 of RCC, out of a total of 5 × 10~6 m~3 of concrete for the whole project. The RCC was placed in a number of stages to allow various other parts of the project, to be started in accordance with the overall programme. In addition there was a gap in the placement to allow for large flows to pass over part of the dam. This paper describes the stages of construction and the construction methodology which it is expected to enable the RCC to be completed rnfour months ahead of schedule.
机译:Son La水电项目的RCC大坝需要略多于3×10〜6 m〜3的RCC,而整个项目总共需要5×10〜6 m〜3的混凝土。 RCC分多个阶段进行,以使项目的其他各个部分可以根据总体计划启动。此外,布置中存在间隙,以允许大流量通过大坝的一部分。本文介绍了预计可以使RCC提前四个月完成的施工阶段和施工方法。

著录项

  • 来源
  • 作者单位

    SMEC International Pty Ltd, 71 Queens Road, Melbourne,Victoria 3004, Australia;

    rnPECC1 Joint Stock Company, Thanh Xuan Nam, Km 9,Nguyen Trai Street, Hanoi, Vietnam;

    AF Colenco Ltd, Taefernstrasse 26, CH-5405 Baden,Switzerland;

    rnAF Colenco Ltd, Taefernstrasse 26, CH-5405 Baden,Switzerland;

    rnMalcolm Dunstan & Associates, Hayford Hall,Buckfastleigh, Devon TQ11 0JQ, UK;

    rnSon La Management Board, It Ong COmmune, Muong La District, 22 Son La Province, Vietnam;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号