首页> 外文期刊>International Journal on Hydropower & Dams >Ground Control Solutions For The Kopswerk Ⅱ, Austria
【24h】

Ground Control Solutions For The Kopswerk Ⅱ, Austria

机译:奥地利KopswerkⅡ地面控制解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

The major underground works for the Kopswerk Ⅱ pumped-storage plant, which were all completed on schedule, represented a complex element of the project. Various tunnelling, excavation and reinforcement methods were used. Kopswerk Ⅱ has been in operation since September 2008, working in parallel with the existing Kopswerk I plant. Located in the Montafon valley, the water source for this plant is from the Silvretta mountain range. From the upper basin of the pow-erplant, 1800 m above sea level at lake Kops, the water flows through a 5.5 km-long pressure tunnel. The flow passes through the surge chamber to a 1.14 km-long inclined pressure shaft, which supplies the powerhouse 710 m below. This powerhouse is connected to the lower Rifa basin by a tailrace tunnel. The station is equipped with three 150 MW reversible units. Construction of the major underground structures began in September 2004.
机译:KopswerkⅡ抽水蓄能电站的主要地下工程已如期完工,是该项目的一个复杂部分。使用了各种隧道,开挖和加固方法。 KopswerkⅡ自2008年9月起投入运行,与现有的Kopswerk I工厂同时运行。该植物的水源位于蒙塔丰(Montafon)山谷,来自西尔弗雷塔(Silvretta)山脉。从粉煤灰的上部盆地,在Kops湖海拔1800 m处,水流过5.5公里长的压力隧道。流动通过调压室到达1.14 km长的倾斜压力轴,该压力轴向下方的动力室710 m供油。该发电站通过尾矿隧道连接到下部Rifa盆地。该电站配备了三个150 MW可逆机组。大型地下结构的建设始于2004年9月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号