Rapid construction of the El Cajon CFRD

机译:El Cajon CFRD的快速建造

获取原文
获取原文并翻译 | 示例
           

摘要

An update on progress at the site of one of the world's major concrete faced rockfill dam projects is presented here. Design and construction features of the 188 m-high El Cajon CFRD are described, together with innovative construction measures and equipment developed to cope with the demand for rapid construction imposed by the EPC contract. The 750 MW El Cajon dam and hydroelectric plant is located on the Santiago river in western Mexico, in the State of Nayarit. The site is about 60 km upstream of the existing 187 m-high Aguamilpa CFRD (Fig. 1). In the family of very high dams, the 188 m-high El Cajon CFRD is the second concrete faced rockfill dam in Mexico and when completed in 2006 will be even higher than its Mexican predecessor Aguamilpa, currently the highest CFRD in operation in the world. The project is owned by Comision Federal de Electricidad (CFE). Construction is being carried out under an Engineering, Procurement and Construction (EPC) contract by Constructora Internacional de Infraestructura S. A. (CIISA), a multinational consortium under the leadership of Ingenieros Civiles Asociados (ICA ) of Mexico.
机译:这里介绍了世界上一个主要的混凝土面板堆石坝项目现场的最新进展。描述了188 m高的El Cajon CFRD的设计和施工特点,以及为满足EPC合同对快速施工的需求而开发的创新施工措施和设备。 750兆瓦的埃尔卡洪大坝和水力发电厂位于纳亚里特州墨西哥西部的圣地亚哥河上。该地点位于现有的187 m高的阿瓜米尔帕CFRD上游约60 km(图1)。在高水坝家族中,188 m高的El Cajon CFRD是墨西哥的第二座混凝土面板堆石坝,2006年完工时将比其墨西哥前身Aguamilpa高,后者是目前运营中的最高CFRD。该项目归Comision Federal de Electricidad(CFE)所有。根据墨西哥Ingenieros Civiles Asociados(ICA)领导的跨国财团,Infrafracon de Infraestructura S. A.(CIISA)的工程,采购和建设(EPC)合同进行施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号