首页> 外文期刊>International Journal of Innovative Computing Information and Control >INTEGRATION OF HART AND FF H1 DEVICES INTO DISTRIBUTED CONTROL SYSTEM FOR FEEDFORWARD CONTROL IN REVAMPING EXISTING PLANTS
【24h】

INTEGRATION OF HART AND FF H1 DEVICES INTO DISTRIBUTED CONTROL SYSTEM FOR FEEDFORWARD CONTROL IN REVAMPING EXISTING PLANTS

机译:将HART和FF H1设备集成到分布式控制系统中,以对现有植物进行改造进行前馈控制

获取原文
获取原文并翻译 | 示例
           

摘要

To revamp existing process plants that use Highway Addressable Remote Transducer (HART) communication technology, reusing the existing instruments which are still available in the market to combine with new Foundation Fieldbus (FF) H1 instruments in the same control system can become a cost-effective strategy for digital modernization. This paper aims at presenting an engineering method based on IEC 61804 standard for integrating a HART field device and FF H1 devices into a distributed control system (DCS) to operate together in a feedforward control loop. To verify the performance of the proposed method, the feedforward on temperature control configured and handled on the DeltaV DCS is employed as an illustrative case study. Moreover, how different analog-input (AI) function block assignments to the HART and FF transmitters for measuring the controlled variable and disturbance input as well as how different proportional-integral-derivative (PID) function block allocations to the DCS controller and FF field devices affect the H1 segment macrocycle schedules and network traffic loads is also analyzed. Experimental results obtained from some control configuration schemes demonstrate that the combined HART-FF H1 technique can maintain the controlled variable at the setpoint in the presence of disturbances for feedforward control.
机译:为了改造使用高速公路可寻址远程传感器(HART)通信技术的现有过程工厂,在同一控制系统中重用市场上仍然可用的现有仪器,以与新的Foundation Fieldbus(FF)H1仪器结合使用,可以变得具有成本效益。数字现代化战略。本文旨在提出一种基于IEC 61804标准的工程方法,用于将HART现场设备和FF H1设备集成到分布式控制系统(DCS)中,以在前馈控制回路中一起运行。为了验证所提出方法的性能,将在DeltaV DCS上配置和处理的温度控制前馈用作说明性案例研究。此外,用于测量受控变量和扰动输入的HART和FF变送器如何分配不同的模拟输入(AI)功能块,以及如何将不同的比例积分微分(PID)功能块分配给DCS控制器和FF字段设备会影响H1段宏周期计划,并分析网络流量负载。从某些控制配置方案获得的实验结果表明,在存在用于前馈控制的干扰的情况下,组合的HART-FF H1技术可以将控制变量保持在设定点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号