首页> 外文期刊>International Journal of Innovative Computing Information and Control >A NOVEL STRATEGY FOR BERTH AND QUAY CRANE ALLOCATION UNDER DISRUPTION IN CONTAINER TERMINAL
【24h】

A NOVEL STRATEGY FOR BERTH AND QUAY CRANE ALLOCATION UNDER DISRUPTION IN CONTAINER TERMINAL

机译:集装箱码头发生扰动时泊位和码头起重机配给的新策略。

获取原文
获取原文并翻译 | 示例
           

摘要

The port operational plan which is optimized before the vessel arrives tends to be disrupted by some uncertainties. And the pre-arranged scheduling plan will be not optimal or even infeasible. In this paper, we focus on the integrated berth and quay crane allocation under disruption. First, an initial allocation model is formulated without taking account of the disruption. Second, a simulation-based strategy is proposed to deal with disruptions. Vessels' berthing times and berthing positions are constrained within stable modes which are extracted through multiple disruption simulations. Under these constraints, a mixed integer linear programming model is presented to solve the integrated berth and quay crane allocation problem. Furthermore, an efficient method is presented to determine the specific quay cranes which serve a vessel. Additionally, four experimental scenarios are designed and conducted on several test instances to validate the performance of the proposed strategy. This strategy proves to be viable. It not only better maintains the stability of the initial scheduling plan but also prevents excessive use of port resources.
机译:在船只到达之前进行优化的港口作业计划往往会因某些不确定因素而中断。并且预先安排的调度计划将不是最优的,甚至是不可行的。在本文中,我们着重讨论在扰乱情况下泊位和码头起重机的综合配置。首先,在不考虑中断的情况下制定了初始分配模型。其次,提出了一种基于仿真的策略来处理中断。船只的停泊时间和停泊位置被限制在稳定模式内,该稳定模式是通过多次破坏模拟提取的。在这些约束条件下,提出了混合整数线性规划模型来解决泊位和码头起重机的集成分配问题。此外,提出了一种有效的方法来确定为船只服务的特定码头起重机。此外,设计了四个实验方案,并在几个测试实例上进行了实施,以验证所提出策略的性能。这种策略被证明是可行的。它不仅可以更好地维护初始调度计划的稳定性,还可以防止端口资源的过度使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号