...
首页> 外文期刊>International Journal of Production Research >Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic
【24h】

Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic

机译:使用E-ACO启发式研究顺序相关的建立时间在集成过程计划和调度中的影响

获取原文
获取原文并翻译 | 示例
           

摘要

In job-shop scheduling, the importance of set-up issues is well known and has been considered in many solution approaches. However, in integrated process planning and scheduling (IPPS) involving flexible process plans, the set-up times are often ignored, or absorbed into processing times in IPPS domain, with the purpose to reduce the complexity. This is based on the assumption that set-up times are sequence-independent, or short enough to be ignored compared to processing times. However, it is not uncommon to encounter sequence-dependent set-up times (SDSTs) in practical production. This paper conducts a detailed investigation on the impact of SDSTs on the practical performance of the schedule: a comparative study is made for different cases where set-up times are (1) separately considered, (2) absorbed into processing times, or (3) totally ignored. An enhanced version of ant colony optimisation (E-ACO) algorithm is used to solve the IPPS problem, with the objective to minimise the total makespan. The following four types of set-up issues are considered: part loading/unloading, fixture preparation, tool switching and material transportation. Situations with various set-up time lengths have been studied and compared. A special case of IPPS problem involving a large number of identical jobs has been specifically studied and discussed. The results have shown that, set-up times should be carefully dealt with under different circumstances.
机译:在车间调度中,设置问题的重要性是众所周知的,并且已在许多解决方案方法中得到考虑。但是,在涉及灵活的过程计划的集成过程计划和调度(IPPS)中,建立时间通常被忽略,或者被吸收到IPPS域中的处理时间中,以降低复杂性。这是基于以下假设:建立时间与序列无关,或者与处理时间相比足够短,可以忽略。但是,在实际生产中遇到序列依赖的设置时间(SDST)并不少见。本文对SDSTs对进度表实际性能的影响进行了详细的调查:针对不同情况进行了比较研究,在不同情况下,设置时间是(1)分别考虑,(2)吸收到处理时间中或(3) )完全忽略了。增强版本的蚁群优化(E-ACO)算法用于解决IPPS问题,目的是最大程度地缩短总寿命。考虑了以下四种类型的设置问题:零件加载/卸载,夹具准备,工具切换和材料运输。已经研究并比较了具有各种设置时间长度的情况。专门研究和讨论了涉及大量相同工作的IPPS问题的特例。结果表明,应在不同情况下仔细设置时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号