...
首页> 外文期刊>International Journal of Production Research >Integrated order selection and production scheduling under MTO strategy
【24h】

Integrated order selection and production scheduling under MTO strategy

机译:MTO策略下的集成订单选择和生产计划

获取原文
获取原文并翻译 | 示例
           

摘要

We consider an integrated order selection and production scheduling problem where a make-to-order (MTO) manufacturer has to select a subset of the orders to process so as to maximise the total profit, and sequence-dependent setup times and costs are incurred between the manufacturing of different classes of products. The problem is formulated as the resource-constrained profitable tour problem (RCPTP) where many variants of the traveling salesman problem (TSP) are its special cases. We model the problem as an integer program and develop an efficient algorithm to solve the problem. Computational results show the efficiency as well as effectiveness of the algorithm. The benefit of the integration is shown and managerial insights are discussed with the computational experiments as well.
机译:我们考虑一个集成的订单选择和生产计划问题,一个按订单生产(MTO)的制造商必须选择要处理的订单子集,以使总利润最大化,并且在这之间产生与序列相关的设置时间和成本制造不同类别的产品。该问题被表述为资源受限的获利旅行问题(RCPTP),其中旅行商问题(TSP)的许多变体是其特例。我们将问题建模为整数程序,并开发一种有效的算法来解决该问题。计算结果表明了该算法的有效性和有效性。显示了集成的好处,并且还通过计算实验讨论了管理的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号