首页> 外文期刊>Work study >Identifying key performance indicators for use in control of pre-project stage process in construction
【24h】

Identifying key performance indicators for use in control of pre-project stage process in construction

机译:确定关键绩效指标,以控制施工中的项目前阶段过程

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The need for measuring construction project performance has led to development andrnimplementation of various key performance indicators (KPIs). This paper aims to present and discussrnthe results of a pilot study and interviews to identify process-based KPIs for use in control of thernpre-project stage.rnDesign/methodology/approach - Initially, the process of the pre-project stage was mapped torndefine its main generic sub-processes and outputs based on the literature review. The process map wasrnthen verified through a pilot study. Based on the verified sub-processes, a number of process-basedrnKPIs were identified and later validated by experts during the interviews.rnFindings - As a consequence of the refinement process due to the results of the pilot study and therninterviews, the process-based KPIs for the pre-project stage were identified and the main issues they have to encompass were discussed.rnOriginality/value - The identified KPIs offer a significant step towards process control within thernpre-project stage. They provide a basis for further development to improve process transparency andrnto explain the relationships between the various sub-processes.
机译:目的-衡量建筑项目绩效的需求导致开发和实施各种关键绩效指标(KPI)。本文旨在介绍和讨论一项试点研究的结果,并进行访谈以识别可用于控制项目前阶段的基于过程的KPI。设计/方法论/方法-最初,将项目前阶段的过程映射为定义其过程。基于文献综述的主要通用子过程和输出。然后通过试点研究验证了过程图。基于已验证的子流程,确定了许多基于流程的KPI,并在随后的访谈中由专家进行了验证。rn发现-由于试点研究和访谈的结果是精炼流程的结果,基于流程的KPI确定了项目前阶段的目标,并讨论了它们必须包含的主要问题。原始性/价值-确定的KPI为在项目前阶段的过程控制迈出了重要的一步。它们为进一步开发提供了基础,以提高过程的透明度,并解释各个子过程之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号