首页> 外文期刊>International Railway Journal >Financial crisis threatens Dublin transit projects
【24h】

Financial crisis threatens Dublin transit projects

机译:金融危机威胁都柏林的过境项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Irish government has conceded two of the three major rail projects in Dublin will be shelved due to the country's financial crisis. A total of €183m has already been spent on Dart Underground, an 8.6km city-centre connection between Dublin's northern and western commuter rail routes; Metro North, the city's first light metro line; and the St Stephen's Green - Liffey Junction extension of the Luas light rail network. Transport minister Mr Leo Varadkar says the government can only afford to proceed with one of these projects in the next five years and an announcement will be made in September on which scheme will go ahead. Varadkar says the other two projects could be revived when fiscal conditions improve.
机译:爱尔兰政府承认,由于该国的金融危机,都柏林三大铁路项目中的两个将被搁置。 Dart Underground已经花费了总计1.83亿欧元,Dart Underground是都柏林北部和西部通勤铁路路线之间8.6公里的城市中心连接点;地铁北,城市的第一条轻轨线;以及Luas轻轨网络的St Stephen's Green-Liffey Junction延伸。运输部长里奥·瓦拉德卡(Leo Varadkar)表示,政府只能在未来五年内进行其中一个项目,9月将宣布实施该计划的消息。 Varadkar说,当财政状况改善时,其他两个项目可能会恢复。

著录项

  • 来源
    《International Railway Journal》 |2011年第5期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号