...
【24h】

First section of Bangalore metro opens

机译:班加罗尔地铁第一段开通

获取原文
获取原文并翻译 | 示例
           

摘要

The first 6.7km section of the Bangalore metro was officially opened on October 20 by India's minister for urban development Mr S K Nath and the chief minister Karnataka state Mr S Gowd. The elevated section runs from M G Road in the city centre to the eastern suburb of Baiyappanahalli, and forms part of an 18km east-west line. A two-line 42.3km network is under construction of which 6.7km will be underground. The metro is equipped with Alstom's Urbalis automatic train control system which will have a design capacity of 40,000 passengers/h/direction. Alstom is also responsible for providing an operations control centre, a back-up control centre and two depots.
机译:10月20日,印度城市发展部长S K Nath先生和印度卡纳塔克邦首席部长S Gowd先生正式开放了班加罗尔地铁的首个6.7公里路段。高架部分从市中心的M G Road延伸至Baiyappanahalli的东郊,构成了一条18公里的东西线。两线42.3公里的网络正在建设中,地下6.7公里。地铁配备了阿尔斯通的Urbalis自动火车控制系统,该系统的设计能力为40,000名乘客/小时/方向。阿尔斯通还负责提供运营控制中心,后备控制中心和两个仓库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号