...
首页> 外文期刊>Jane's Defence Weekly >Detail design beginning for ORP sub
【24h】

Detail design beginning for ORP sub

机译:ORP子的详细设计开始

获取原文
获取原文并翻译 | 示例
           

摘要

A proposal for the detail design phase of the US Navy's (USN's). Ohio-class nuclear-powered ballistic missile submarine (SSBN) replacement programme (ORP) is imminent, it was said on 17 May. Previously selected as the prime contractor for the USN's ORP effort, General Dynamics Electric Boat (GDEB) is to submit its proposal to Naval Sea Systems Command (NAVSEA) on 20 May and negotiations will commence in mid-2016, culminating in a contract award in the final quarter of 2016, Captain David Goggins, ORP programme manager, said at a briefing at the Navy League's Sea-Air-Space symposium. The ORP is expected to proceed through a 'Milestone B' review in August to enter the engineering and manufacturing development phase.
机译:美国海军(USN)详细设计阶段的提案。据5月17日报道,俄亥俄级核动力弹道导弹核潜艇(SSBN)的更换计划(ORP)迫在眉睫。通用动力电动船(GDEB)先前被选为USN ORP工作的主要承包商,它将于5月20日向海军海系统司令部(NAVSEA)提交其提案,谈判将于2016年中开始,最终将在2011年授予合同在2016年最后一个季度,ORP计划经理大卫·戈金斯上尉在海军联盟海空研讨会上的简报中说。预计ORP将于8月通过“里程碑B”审查,进入工程和制造开发阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号