首页> 外文期刊>Jane's Defence Weekly >US Navy 'curtails' DDG1000 plans
【24h】

US Navy 'curtails' DDG1000 plans

机译:美国海军“窗帘” DDG 1000计划

获取原文
获取原文并翻译 | 示例
           

摘要

The US Navy (USN) is scaling back plans to build the Zumwalt-class (DDG 1000) destroyer, effectively ending the programme at two vessels. Lieutenant Clayton Doss, a navy spokesman, confirmed on 24 July the service would end the DDG 1000 programme after completion of the first two ships. When DDG 1000 was first conceived, the service had anticipated building as many as 32 of the advanced destroyers; the proposed buy was eventually trimmed to seven hulls. Two DDG 1000s are currently under contract: the first will be built by General Dynamics Bath Iron Works (BIW) in Bath, Maine; a second will be built at Northrop Grumman's Ingalls yard in Pasca-goula, Mississippi.
机译:美国海军(USN)正在缩减建造Zumwalt级(DDG 1000)驱逐舰的计划,从而有效地在两艘船上终止了该计划。海军发言人克莱顿·多斯中尉(Clayton Doss)在7月24日确认,该服务将在前两艘舰艇完工后终止DDG 1000计划。最初设想DDG 1000时,该部门预计会建造多达32艘先进驱逐舰。拟议的购买最终被削减为七个船体。目前正在与两台DDG 1000签订合同:第一套将由通用动力巴斯钢铁厂(BIW)在缅因州巴斯制造;第二架将在密西西比州帕斯卡古拉的诺斯罗普·格鲁曼公司的Ingalls堆场建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号