...
首页> 外文期刊>Jane's Defence Weekly >Helicopter carrier heads for the ocean after upgrade
【24h】

Helicopter carrier heads for the ocean after upgrade

机译:升级后的直升机母舰驶向海洋

获取原文
获取原文并翻译 | 示例
           

摘要

The UK Royal Naval helicopter carrier HMS Ocean steamed out of Plymouth on 24 September to begin sea trials following a year-long GPB3S million (USD64.8 million) docking period. Undertaken by through-life support contractor Bab-cock Marine, the work package included upgrades to the amphibious ship's defensive weapon suite, aviation support and communications facilities, accommodation and waste disposal systems. The original package, including more than 40 alterations and additions, increased in size over the maintenance period. Savings of some GBP2.5 million were achieved through planning for optimum cost-efficiency, according to Babcock Marine.
机译:在长达一年的GPB3百万(6,480万美元)对接期之后,英国皇家海军直升机母舰HMS Ocean于9月24日从普利茅斯蒸出,开始海上试验。由终身支持承包商Bab-cock Marine承接的工作包包括升级两栖舰船的防御武器套件,航空支持和通讯设施,住宿和废物处理系统。在维护期内,原始包装(包括40多种更改和补充)的尺寸有所增加。据Babcock Marine称,通过计划最佳成本效率,节省了约250万英镑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号