...
首页> 外文期刊>Jane's Defence Weekly >Cost concerns force Brazilian Navy to decommission ships
【24h】

Cost concerns force Brazilian Navy to decommission ships

机译:成本问题迫使巴西海军退役舰艇

获取原文
获取原文并翻译 | 示例
           

摘要

The Brazilian Navy will retire two of its warships that are currently out of service because it will cost too much to repair and upgrade the vessels. The first will be the first-of-class frigate Niterdi (F40), which is scheduled to be decommissioned on 28 June. The ship was built in the UK by Vosper Thornycroft, commissioned on 20 November 1976, and went out of service in2015.It has been moored pierside since then.
机译:巴西海军将退役目前停运的其中两艘军舰,因为维修和升级这些舰艇的费用太高。第一架将是一流的护卫舰尼特尔迪(F40),计划于6月28日退役。该船由沃斯珀·桑尼克罗夫特(Vosper Thornycroft)于1976年11月20日在英国建造,于2015年停用,此后一直停泊在码头旁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号