...
首页> 外文期刊>Journal of Civil Engineering and Management >COMPUTERIZED INTEGRATED PROJECT MANAGEMENT SYSTEM FOR A MATERIAL PULL STRATEGY
【24h】

COMPUTERIZED INTEGRATED PROJECT MANAGEMENT SYSTEM FOR A MATERIAL PULL STRATEGY

机译:材料拉动策略综合项目管理系统

获取原文
获取原文并翻译 | 示例
           

摘要

The purpose of this paper is to present a computerized integrated project management system and report results of a survey on the effectiveness of the system. The system consists of a scheduling system, material management system, labor/equipment system, and safety/quality control system. The backbone system is a scheduling system that adopts a production planning system and a project scheduling system. The lowest level in the scheduling system is a daily work management system, which is linked to each functional management system (i.e. material management system, labor/equipment system, and safety/quality control system). The paper focuses on the material management and scheduling systems to implement a material "pull" system to reduce material inventories on site. Details of material management and scheduling systems are discussed, and a sample application is presented to demonstrate the features of the proposed computer application system. The paper presents practitioners and researchers with a practical tool to integrate material management and scheduling systems for site personnel.
机译:本文的目的是提出一个计算机化的综合项目管理系统,并报告有关该系统有效性的调查结果。该系统包括调度系统,物料管理系统,人工/设备系统和安全/质量控制系统。骨干系统是采用生产计划系统和项目计划系统的计划系统。调度系统中最底层的是日常工作管理系统,该系统与每个功能管理系统(即物料管理系统,人工/设备系统和安全/质量控制系统)相链接。本文重点介绍了用于实施物料“拉动”系统以减少现场物料库存的物料管理和计划系统。讨论了物料管理和调度系统的详细信息,并提供了一个示例应用程序来演示所提出的计算机应用程序系统的功能。本文为从业人员和研究人员提供了一种实用的工具,以集成现场人员的物料管理和计划系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号