...
首页> 外文期刊>Public Transport International >The second phase of TransMilenio
【24h】

The second phase of TransMilenio

机译:TransMilenio第二阶段

获取原文
获取原文并翻译 | 示例
           

摘要

The TransMilenio system came into operation in January 2001 with an initial fleet of 113 trunk buses that was expanded gradually as new infrastructures came on line. By the time the first phase was completed, the system consisted of 470 articulated buses that travelled via three trunk routes, covering a distance of 42 kilometres equipped with 57 standard stations and four terminal stations. The system currently handles an average weekday demand of 750,000 passengers. On 20 November 2003, the second phase of the system consisting of three further trunk routes came on line.
机译:TransMilenio系统于2001年1月投入运营,最初的113辆主干巴士车队随着新基础设施的投入使用而逐步扩展。到第一阶段完成时,该系统由470辆铰接式公共汽车组成,这些公共汽车通过3条主干路线行驶,覆盖42公里,设有57个标准站和4个终点站。该系统目前可处理平日平均需求75万名乘客。 2003年11月20日,系统的第二阶段(由另外三个干线组成)上线了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号