In the fall of 2008, the South Central Connecticut Regional Water Authority embarked on a project to re-paint and rehabilitate a 4.3 million gallon capacity steel water storage tank. The project was carefully planned, to undertake rehabilitation of the tank following the high demand summer season, and to place the tank back in service by the spring of 2009. When the painting project was initiated, inspections of the structural roof members revealed a significantly worse condition than anticipated. This discovery, and the projected additional repair costs, prompted the Authority to investigate all options. Under the constraint of a tight schedule and the necessity to place the tank back in service in the spring of 2009, the Authority reviewed options, ultimately deciding to demolish the existing tank and construct a new 2.0 million gallon prestressed concrete tank in its place. The decision to replace the tank allowed the Authority to address optimum capacity for the facility, to install updated safety and security equipment, and to install a mixing system. This paper describes the initial sequence of events, the evaluation of options, the procurement and scheduling process, and illustrates the challenges of the fast-track construction project.
机译:在2008年秋天,康涅狄格州中南部地区水务局开始了一个项目,以重新粉刷和修复430万加仑容量的钢制储水箱。该项目经过精心计划,要在夏季需求旺盛的季节对储罐进行修复,并在2009年春季之前使储罐重新投入使用。启动涂装项目时,对结构屋顶构件的检查发现情况明显恶化状况超出预期。这一发现以及预计的额外维修费用促使管理局调查了所有选择。在紧张的日程安排和必须于2009年春季重新使用该储罐的限制下,管理局审查了各种选择,最终决定拆除现有储罐,并在其位置建造一个新的200万加仑预应力混凝土储罐。更换储罐的决定使管理局能够处理该设施的最佳容量,安装更新的安全和保安设备以及安装混合系统。本文描述了事件的初始顺序,选项评估,采购和进度安排过程,并说明了快速通道建设项目所面临的挑战。

著录项

  • 来源
  • 作者单位

    Tata & Howard, Inc., Meriden, CT (formerly Project Engineer, South Central Connecticut Regional Water Authority and Project Engineer for the Grassy Hill Tank replacement project);

    Vice President and New England Regional Manager, DN Tanks (formerly Natgun Corporation), Wakefield, MA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号