...
【24h】

In A Class By Itself

机译:自己上课

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the Millennium High School is a response to an aggressive revitalization plan for the downtown portion of New York City after September 11, 2001. By taking advantage of the abundant amount of empty office space in the area, the school now occupies a corner of an office building's first floor as a separate entry, gallery, multipurpose room and pre-function space as well as three entire floors (11,12,13)―a grand total of 100, 000 sq ft of space. Construction took place from July-August of 2003, and the school officially opened last fall. The successful design and construction at Millennium High School was accomplished through the application of private sector experience combined with a thoughtful community consensus building process provided by The Lower Manhattan Development Council (LMDC). The LMDC provided private funding from many businesses, corporations and financial institutions in the immediate area to fill the need for secondary education facilities in the downtown district.
机译:千年高中的建设是对2001年9月11日后针对纽约市市区积极的振兴计划的回应。利用该地区大量的空办公室空间,学校现在占据了纽约市的一个角落。一栋办公楼的第一层,作为单独的入口,画廊,多功能室和迎宾空间,以及三层整个楼层(11、12、13),总计100,000平方英尺。该建筑于2003年7月至8月进行,该学校于去年秋天正式开业。千年中学的成功设计和建造是通过应用私营部门的经验以及曼哈顿下城发展委员会(LMDC)提供的经过深思熟虑的社区共识建设过程而完成的。 LMDC从临近地区的许多企业,公司和金融机构提供了私人资金,以满足市中心对中等教育设施的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利