首页> 外文期刊>Maritime Journal >Fugro begins work at Baltic Eagle offshore wind farm
【24h】

Fugro begins work at Baltic Eagle offshore wind farm

机译:辉固开始在波罗的海鹰海上风电场工作

获取原文
获取原文并翻译 | 示例
           

摘要

Fugro recently began a marine site characterisation programme at Iberdrola's Baltic Eagle Offshore Wind Farm, 30km off the coast of the German island of Ruegen in the Baltic Sea. Work is scheduled to run until February 2019. The Netherlands headquartered company will undertake a UXO (unexploded ordnance) survey to clear the investigation sites, followed by a geotechnical seabed assessment and borehole drilling. The work scope also includes standard and advanced laboratory testing. Amongst others, the geophysical survey vessel Fugro Pioneer and geotechnical drilling vessel Fugro Scout which mobilised on this project. To enhance quality and operational efficiency, the proven Geobor-S piggyback drilling system will also be deployed during the project.
机译:辉固最近在伊贝德罗拉(Iberdrola)的波罗的海鹰海上风电场开始了一项海洋站点表征计划,该项目位于波罗的海的德国吕根岛沿岸30公里处。工作计划持续到2019年2月。这家总部位于荷兰的公司将进行UXO(未爆炸弹药)调查,以清理调查地点,然后进行岩土技术海底评估和钻孔。工作范围还包括标准和高级实验室测试。除其他外,动员了该项目的地球物理勘测船Fugro Pioneer和岩土钻探船Fugro Scout。为了提高质量和运营效率,在项目期间还将部署经过验证的Geobor-S背负式钻井系统。

著录项

  • 来源
    《Maritime Journal》 |2018年第367期|70-70|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号