首页> 外文期刊>Mathematical Problems in Engineering >Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations
【24h】

Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations

机译:词典编目多目标装配线与多人站的平衡

获取原文
获取原文并翻译 | 示例
           

摘要

In a multi-manned assembly line, tasks of the same workpiece can be executed simultaneously by different workers working in the same station. This line has significant advantages over a simple assembly line such as shorter line length, less work-in-process, smaller installation space, and less product flow time. In many realistic line balancing situations, there are usually more than one objective conflicting with each other. This paper presents a preemptive goal programming model and some heuristic methods based on variable neighborhood search approach for multi-objective assembly line balancing problems with multi-manned stations. Three different objectives are considered, minimizing the total number of multi-manned stations as the primary objective, minimizing the total number of workers as the secondary objective, and smoothing the number of workers at stations as the tertiary objective. A set of test instances taken from the literature is solved to compare the performance of all methods, and results are presented.
机译:在多人流水线上,同一工件的任务可以由在同一工位工作的不同工人同时执行。与简单的装配线相比,该生产线具有显着的优势,例如,较短的线长,较少的在制品,较小的安装空间和较少的产品流动时间。在许多现实的生产线平衡情况下,通常存在多个相互冲突的目标。针对多人站多目标流水线平衡问题,提出了一种基于变量邻域搜索的先占目标规划模型和启发式方法。考虑了三个不同的目标,即以多人操作站的总数量为主要目标,最小化工作人员的总人数为次要目标,并以平稳的工作人员数为第三目标。解决了取自文献的一组测试实例,以比较所有方法的性能,并给出了结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号