...
首页> 外文期刊>Military review >Retaking a District Center: A Case Study in the Application of Village Stability Operations
【24h】

Retaking a District Center: A Case Study in the Application of Village Stability Operations

机译:接管地区中心:以乡村稳定行动的应用为例

获取原文
获取原文并翻译 | 示例
           

摘要

The growth of ALP forces as well as the ANP, and the construction of a series of checkpoints throughout Chora, dramatically improved security in the area and began to physically push the Taliban out. In addition, the wall's sheer presence also demonstrated to local villagers, GIRoA officials, and tribal leaders that security could be established and become an enduring condition instead of a temporary, unsustainable effect. The growth of the Afghan local security forces was greatly enabled by the simultaneous construction of the Great Wall of Chora, which set the conditions for securing the villages of Nyazi and Chora. Through shaping the physical terrain of the Chora Valley, the wall stemmed insurgent infiltration into the provincial capital of Tarin Kowt and secured a section of the Tarin Kowt/Chora/Gizab Road, which had long been subject to improvised explosive device attacks.
机译:ALP部队和ANP的增长,以及在Chora各处建立一系列检查站的建立,大大提高了该地区的安全性,并开始实际将塔利班赶出市场。此外,隔离墙的纯粹存在还向当地村民,GIRoA官员和部落首领表明,可以建立安全保障并使其成为持久的条件,而不是暂时的,不可持续的效果。乔拉长城的同时建设极大地促进了阿富汗地方安全部队的发展,这为确保尼亚齐和乔拉村庄的安全创造了条件。通过塑造乔拉河谷的自然地形,隔离墙阻止了叛乱分子渗透到塔林科夫省首府,并确保了塔林科夫/乔拉/吉萨布路的一部分,该路段长期以来一直遭到简易爆炸装置的袭击。

著录项

  • 来源
    《Military review》 |2015年第2期|118-124|共7页
  • 作者

    Daniel R. Green;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号