...
首页> 外文期刊>Military technology >Revised Industrial Strategy, New Contracts for the CVF Programme
【24h】

Revised Industrial Strategy, New Contracts for the CVF Programme

机译:修订的产业战略,CVF计划的新合同

获取原文
获取原文并翻译 | 示例
           

摘要

The Management Board of the Aircraft Carrier Alliance (ACA), which is acting as prime contractor for the design an construction of two QUEEN ELIZABETH-class STOVL carriers for the Royal Navy (CVF programme), has approved a revision to the build strategy for the two ships.rnThe adjustment is intended to meet the MoD's budget requirements, reduce risk and protect core capability in the main UK shipyards, in keeping with the outcome of the MoD's Equipment Examination of late 2008 and the decision to re-schedule delivery of the two carriers.
机译:航空母舰联盟(ACA)的管理委员会正在作为主要承包商,为皇家海军设计两艘QUEEN ELIZABETH级STOVL航母的建造(CVF计划),并已批准了对此次调整旨在满足国防部的预算要求,降低风险并保护英国主要造船厂的核心能力,以符合国防部在2008年末进行的设备检查的结果以及重新安排这两艘船交付的决定运营商。

著录项

  • 来源
    《Military technology》 |2009年第5期|92-93|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号