...
首页> 外文期刊>Military technology >Switzerland Postpones Fighter Programme
【24h】

Switzerland Postpones Fighter Programme

机译:瑞士推迟战斗机计划

获取原文
获取原文并翻译 | 示例
           

摘要

The Swiss Federal Council has decided to amend the schedule for the planned acquisition of a new combat aircraft, intended to partially replace the current fleet of F-5E TIGER II fighters.rnComparative evaluations of the three final contenders - the Dassault RAFALE, the Eurofighter TYPHOON and the Saab GRIPEN NG - were carried out during 2008, and the final bids by the corresponding manufacturers were received earlier this year. Selection was expected to be announced during 2009,rnwith a contract to be then included in the Armaments Programme 2010. The Federal Council has now instructed the Department of Defence, Civil Protection and Sport (DDPS) to submit a report on the national security policy by December 2009. A decision on the partial replacement of the TIGERs will be taken only after that date, i.e. most likely in 2010.
机译:瑞士联邦委员会已决定修改计划购买新战斗机的时间表,以部分替换目前的F-5E TIGER II战斗机。rn对最后三个竞争者的比较评估-达索RAFALE,欧洲战斗机TYPHOON和Saab GRIPEN NG-于2008年进行,今年年初收到了相应制造商的最终竞标。预计将在2009年宣布甄选,并与合同合并,然后将其纳入2010年军备计划。联邦委员会现在已指示国防,民防和体育部(DDPS)提交有关国家安全政策的报告, 2009年12月。仅在该日期之后(即最有可能在2010年)做出关于部分更换TIGER的决定。

著录项

  • 来源
    《Military technology》 |2009年第5期|93-93|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号