Plan the work, work the plan

机译:计划工作,计划工作

获取原文
获取原文并翻译 | 示例
           

摘要

The number of BWTS retrofits carried out to date is rather small so most class societies, shipyards, contractors and suppliers are dealing with projects and technologies about which they have little or no experience. This means that project managers should assume that BWTS retrofit planning and execution timelines will be longer than usual for retrofit projects of this size and an early survey of the vessel is highly recommended. In this case, Coldharbour's engineers completed this nine months before installation on board a VLCC in China.
机译:迄今为止,BWTS改造的数量很少,因此大多数船级社,造船厂,承包商和供应商都在处理很少或根本没有经验的项目和技术。这意味着项目经理应假定BWTS改造计划和执行时间表将比通常规模的改造项目更长,因此强烈建议对船舶进行早期检查。在这种情况下,Coldharbour的工程师完成了这9个月的工作,然后才将其安装在中国的VLCC上。

著录项

  • 来源
    《Offshore Support Journal》 |2014年第4suppla期|59-59|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号