...
【24h】

International

机译:国际化

获取原文
获取原文并翻译 | 示例
           

摘要

The construction of a production facility in Schiedam, The Netherlands, by Huisman offers the largest indoor lifting capacity in Europe - 1,200 metric tons - and allows for fast installation, commission and testing of several products and systems, including five newly built pipelay systems. The pipelay systems at the Huisman Schiedam quayside include an 800-metric ton multi-lay system for Ezra's Lewek Constellation, a 275-metric ton vertical-lay system for Ceona's Polar Onyx, a 150-metric ton vertical-lay system for (VARD) Ocean Installer's Normand Vision and a portable 150-metric ton vertical-lay system for Technip.
机译:豪斯曼在荷兰的斯希丹(Schiedam)建造了生产设施,提供了欧洲最大的室内起重能力-1,200公吨-并允许快速安装,调试和测试多种产品和系统,包括五个新建的管道铺设系统。 Huisman Schiedam码头的管道铺设系统包括用于Ezra的Lewek Constellation的800公吨多层铺设系统,用于Ceona的Polar Onyx的275公吨垂直铺设系统,用于(VARD)的150公吨垂直铺设系统Ocean Installer的Normand Vision和用于Technip的便携式150公吨垂直铺设系统。

著录项

  • 来源
    《Pipeline & gas journal》 |2014年第3期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号