...
首页> 外文期刊>Pipeline & gas journal >Finger Lakes Storage Still Sitting In Limbo
【24h】

Finger Lakes Storage Still Sitting In Limbo

机译:手指湖存储仍坐在凌波

获取原文
获取原文并翻译 | 示例
           

摘要

Inergy Midstream's proposed Finger Lakes facility, which would store 88 million gallons of propane in old salt caverns in western New York, has been held up by the state's Environmental Conservation Department for more than four years. "Finger Lakes is one of the things that's on our regulatory wish list," said Mollie O'Dell, of National Propane Gas Association, in addressing the propane shortage felt this past winter in the Northeast. The design would likely include four 700-hp compressors and two open brine ponds at a location above Seneca Lake, as well as six rail spurs expected to carry 24 tanker cars every 12 hours. Connections to the storage facility would be made to Millennium and Dominion interstate pipelines.
机译:该州环境保护部拖延了Inergy Midstream拟议中的手指湖设施,该设施将在纽约西部的旧盐洞中储存8800万加仑的丙烷。全国丙烷气体协会的莫利·奥德尔(Mollie O'Dell)在谈到东北冬季过去的丙烷短缺时说:“手指湖是我们监管愿望清单中的其中一项。”该设计可能包括在塞内卡湖上方的位置上安装四台700马力的压缩机和两个露天盐水池,以及六个铁路支线,预计每12小时会运送24辆加油车。与存储设施的连接将连接到Millennium和Dominion州际管道。

著录项

  • 来源
    《Pipeline & gas journal》 |2014年第5期|72-72|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号