首页> 外文期刊>Pipeline & gas journal >Challenging HDD Project Provides 10,000-Foot Record-Setting Crossing
【24h】

Challenging HDD Project Provides 10,000-Foot Record-Setting Crossing

机译:具有挑战性的HDD项目提供10,000英尺的创纪录记录

获取原文
获取原文并翻译 | 示例
           

摘要

A new global horizontal directional drill (HDD) undersea crossing record has been set in terms of pipe diameter, pipe weight and length of crossing in Saudi Arabia.rnThe record-setting bore came during the drilling of a second 10,000-foot bore and pull-in of a 30-inch pipe near Al Jabayl for the Bern Causeway Pipeline project. This second bore was 42 inches in diameter and qualifies as a new world record length crossing.rnIn 2007, Tatco Boring of Abu Dhabi was awarded the Berri Causeway Flank 2 HDD project. The main contractor is Al Robaya Est. and the owner is Saudi Aramco. The project required a bay crossing comprising two parallel pipelines, each more than 3,150 meters in length. The first was a 24-inch oil trunkline that required a 32-inch bore. The second involved a parallel 30-inch steel water line that weighed in excess of 1,525 tons and required a 42-inch bore.
机译:在管道直径,管道重量和沙特阿拉伯的管道长度方面,已经建立了一个新的全球水平定向钻机(HDD)海底穿越记录。rn该设置记录的钻孔发生在第二个10,000英尺钻孔和拉拔钻进过程中。位于Al Jabayl附近的一条30英寸长的管道中,用于伯尔尼铜锣管道项目。第二个孔的直径为42英寸,符合世界纪录。2007年,阿布扎比的Tatco Boring被授予Berri Causeway Flank 2 HDD项目。主要承包商是Al Robaya Est。所有者是沙特阿美公司。该项目需要一个跨海湾的设施,包括两条平行的管道,每条管道的长度均超过3,150米。第一个是需要32英寸孔的24英寸石油干线。第二条包括一条平行的30英寸钢制水管,重达1,525吨,需要一个42英寸的孔。

著录项

  • 来源
    《Pipeline & gas journal》 |2009年第5期|4042|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号