...
首页> 外文期刊>Pipeline & gas journal >Insider Tips On Buying A SCADA System
【24h】

Insider Tips On Buying A SCADA System

机译:购买SCADA系统的内部提示

获取原文
获取原文并翻译 | 示例
           

摘要

As you know, replacing a SCADA system is a big deal. The irony is that despite the importance of a SCADA replacement project, most companies don't have all that much experience doing it. Most companies replace a SCADA system every 10 to 15 years. Typically, it can take two to five years to complete the system. Many companies have specific procedures for replacing a SCADA system, Those procedures worked the last time they acquired a SCADA system. But that was a long time ago. Many companies find that the technology has changed since then, the vendors have changed, and the old procurement process is no longer as efficient as it might be.
机译:如您所知,更换SCADA系统非常重要。具有讽刺意味的是,尽管SCADA替代项目非常重要,但大多数公司在实施该项目方面经验不足。大多数公司每10到15年更换一次SCADA系统。通常,可能需要两到五年才能完成系统。许多公司都有更换SCADA系统的特定程序。这些程序在最后一次购买SCADA系统时有效。但那是很久以前的事了。许多公司发现,此后技术发生了变化,供应商也发生了变化,旧的采购流程不再像以前那样高效。

著录项

  • 来源
    《Pipeline & gas journal》 |2005年第9期|p.61-62|共2页
  • 作者

    Mike Walden;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号