...
首页> 外文期刊>Power in Europe >German TSO awards 300 MW grid stability unit to LEAG’s GKL
【24h】

German TSO awards 300 MW grid stability unit to LEAG’s GKL

机译:德国TSO奖励300 MW网格稳定单元到Leag的GKL

获取原文
获取原文并翻译 | 示例
           

摘要

Gaskraftwerk Leipheim (GKL) has been awarded a contract for a 300 MW gas-fired grid stability generation unit in southern Germany, grid operator Amprion said Feb. 10. GKL plans to build the plant at a new site on a former military air base between Stuttgart and Munich, it said. Amprion said the plant would be available from Aug. 5, 2023, providing flexibility in southern Germany once nuclear power has been phased out. On Feb. 9 German lignite operator LEAG acquired GKL from SWU (Stadtwerke Ulm). LEAG said the plant would be operated outside of the wholesale market for ten years. Control of the plant is to be integrated with LEAG’s lignite-fired power plant Schwarze Pumpe and operated by Siemens Energy.
机译:Givheim(GKL)已被授予德国南部300兆瓦的燃气电网稳定发电单位授予合同,电网运营商Amprion 2月10日表示,GKL计划在介于前军用空气基地的新网站上建造工厂它说,斯图加特和慕尼黑。 Amprious表示,该植物将于2013年8月5日起提供,一旦核电已经逐步淘汰,德国南部提供灵活性。 2月9日德国褐煤运营商联合从SWU获得了GKL(Stadtwerke ULM)。 Leag表示,该工厂将在批发市场之外运营十年。该工厂的控制将与Leag的褐煤发电厂Schwarze泵集成,并由西门子能量操作。

著录项

  • 来源
    《Power in Europe》 |2021年第841期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号