首页> 外文期刊>Power in Europe >Mhi Wins Edf Generator Order
【24h】

Mhi Wins Edf Generator Order

机译:Mhi赢得Edf发电机订单

获取原文
获取原文并翻译 | 示例
           

摘要

Japan's Mitsubishi Heavy Industries in partnership with France's COMEX Nucleaire has received an order from EDF to supply six replacement steam generators for its pressurized water reactor nuclear power plants in France.rnMHI announced January 8 that it would start delivering the generators in 2013 for completion in 2014. It did not reveal the value of the contract or the name of the plants to be supplied.rnThe project is being managed by EDF's Generation Nuclear Engineering Center (CIPN) at Marseilles. EDF is replacing the steam generators at its PWR nuclear plants, which were commissioned in the 1980s, as part of its nuclear plant component renewal program. EDF operates in total 58 pressurized water reactors in France.
机译:日本三菱重工与法国COMEX Nucleaire公司已接到法国电力公司的订单,为其法国的压水堆核电站提供6台替代蒸汽发生器。rnMHI于1月8日宣布,它将在2013年开始交付这些发生器,并于2014年完成。该项目没有透露合同价值或将要提供的电厂名称。该项目由法国电力公司位于马赛的发电核工程中心(CIPN)管理。作为其核电站组件更新计划的一部分,EDF正在其压水堆核电站(其于1980年代投产)替换蒸汽发生器。法国电力公司在法国共有58座压水堆运行。

著录项

  • 来源
    《Power in Europe》 |2009年第542期|58|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号