首页> 外文期刊>Power in Europe >Steiermark Wins Hydro Consents
【24h】

Steiermark Wins Hydro Consents

机译:Steiermark赢得Hydro同意

获取原文
获取原文并翻译 | 示例
           

摘要

Increasing energy demand combined with problems ovei Russian gas deliveries and a stretch of below-freezing temperatures have combined to create an uncommon unity over additional hydro power among political factions. The first signal is decision of the federal environmental senate approving two long-proposed smaller plants in Styria below Graz on the Mur river. These are now expected to be in service in 2012 at Gossendorf and Kahlsdorf, each with about 18.5-MW and combined annual output of 166 GWh.rnEnergie Steiermark is to invest €155 million in the facilities with €20 million allocated for environmental aspects to include flood protection. "To date no other hydro plant in Austria has included such extensive ecological measures," says a company spokesman, citing these as a likely reason why the environmental senate rejected all of the objections of various environmental groups.
机译:能源需求增加,加上俄罗斯天然气输送出现问题,以及冰点以下的低温,共同导致政治派别之间在额外的水力发电上形成了罕见的统一。第一个信号是联邦环境参议院批准在穆尔河上格拉茨下方的施蒂利亚州的两处长期提议的小型工厂的决定。这些设备现在预计将在2012年分别在Gossendorf和Kahlsdorf投入使用,每个设备的功率约为18.5 MW,年总产量为166 GWh。rn Ernergie Steiermark将投资1.55亿欧元建设设施,其中2000万欧元将用于环境方面,包括防洪。公司发言人说:“迄今为止,奥地利的其他水电厂都没有采取如此广泛的生态措施。”这是环境参议院拒绝各种环境团体的所有反对意见的可能原因。

著录项

  • 来源
    《Power in Europe》 |2009年第542期|56|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号