首页> 外文期刊>Platts Megawatt Daily >FPL picks up pace of battery storage installations, pushing up industry total
【24h】

FPL picks up pace of battery storage installations, pushing up industry total

机译:FPL加快了电池存储设备的安装速度,推动了行业总量

获取原文
获取原文并翻译 | 示例
           

摘要

Florida Power & Light is quickening the pace of battery storage installations at its solar facilities, helping to push up the total amount of new battery systems installed industry-wide by almost 10% in the early part of 2018. At the end of the fourth quarter 2017 there was a total of 604 MW of battery storage installed by power generating companies around the country. There has been an estimated 56-MW of battery systems installed this year. On March 9, Florida Power & Light said it installed a 10-MW/40-MWh battery storage system at its 74.5 MW Babcock Ranch Solar facility in Charlotte County. In mid-February the Juno Beach, Florida-based utility installed a 4-MW/16-MWh battery system at its 74.5-MW Citrus Solar facility in Desoto County. Both of the solar facilities were initially brought online in 2016.
机译:佛罗里达电力与照明公司正在加快其太阳能设施中电池存储装置的安装速度,从而有助于在2018年初将整个行业安装的新电池系统的总量提高近10%。在第四季度末2017年,全国各地的发电公司总共安装了604兆瓦的电池储能。据估计,今年安装了56兆瓦的电池系统。 3月9日,佛罗里达电力与照明公司(Florida Power&Light)表示已在其夏洛特县74.5兆瓦Babcock Ranch Solar设施中安装了10兆瓦/ 40兆瓦时的电池存储系统。 2月中旬,这家位于佛罗里达州朱诺海滩的公用事业公司在其Desoto County的74.5 MW Citrus Solar设施中安装了4 MW / 16 MWh电池系统。这两个太阳能设施最初于2016年上线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号